Log Entry: Site-96 Anomaly Report

This report details the current anomalous activity detected at Site-96 on date. At approximately time, multiple staff reported experiencing strange sensory phenomena. Early analysis suggest the anomaly is centered around a specific area. A team of containment specialists has been dispatched to Site-96 and procedures are in progress. Further details will be provided as they become available.

Secure Containment Protocols: Site-96 Update

Recent incidents at Site-96 have necessitated a review and revision of existing containment protocols. The primary concern stems from the anomalous behavior exhibited by SCP-number. This change in behavior presents a potential threat to both personnel and the surrounding environment. To mitigate this risk, several strategies have been introduced. A new containment cell, constructed with reinforced materials, has been deployed for SCP-number. Additionally, personnel rotations will be increased to minimize exposure and potential contamination. All personnel are reminded to adhere strictly to the revised protocols outlined in document designation.

  • Specific protocol changes remain classified pending further analysis.

Log Log: Site 96 - Personnel Confidential

Subject Alphabetical designations remain heavily Redacted. Initial Dispatch records for Agent Smith, designated as Task Force Bravo lead, are Corrupted. Evidence suggests a potential Breach during the initial Interaction with SCP-96. Further analysis of recovered data is required to determine the full extent of the Incident.

  • Supplementary log entries are currently Forwarded for declassification review.
  • Site security protocols Were/Are/Have Been implemented following the incident, including but not limited to, increased perimeter Monitoring, access restrictions, and mandatory De-briefings.

Their primary objective remains containment of SCP-96 and mitigation of any Consequential effects.

Log Entry: Site-96 Breach Protocol Activated

At estimated hour:minute hours on date, a containment breach was registered at Site-96. The breach involved an anomalous entity of unknown origin and potential severity. All personnel have been informed to initiate the established breach protocol, designated as "Red Scale". Preliminary reports indicate heavy resistance from SCP-number and significant system damage. A full reconnaissance is underway to determine the extent of the breach and the status of all personnel. Further updates will be communicated as they become available.

Authorizing Site-96 Terminations

This document outlines the protocol for authorizing termination actions within Site-96. Access to this information is strictly limited to designated personnel as listed below. Any unauthorized access or dissemination of this document will result in immediate termination.

  • Personnel on-Site:
    • Head Researcher
    • Site Overseer
  • High Command Approval

All terminations must be approved in writing and adhere to the strict protocols outlined in Addendum A: Termination Protocols|Appendix B: Security Clearance Levels}. Failure to comply with these regulations may result in disciplinary action.

Request Denied

Following thorough review of the presented request for de-classification pertaining to Site-96, the Approving Committee has issued a formal rejection. The motivations behind this website decision are redacted and will not be revealed at this time. Additionally, any further requests regarding Site-96 will be subject to the same rigorous scrutiny and may result in identical outcomes.

  • Please refrain from pursuing any illegitimate access to information concerning Site-96.
  • Any violations of this directive will be met with legal action.

Leave a Reply

Your email address will not be published. Required fields are marked *